ECMWF WAM

ScheduledWaves

ECMWF · 7.6 nm · Global

ECMWF's global wave model coupled to IFS, with ensemble waves (ENS-WAM); part of the free open data.

When is ECMWF WAM updated?

ECMWF WAM runs four times a day, at 00Z, 06Z, 12Z and 18Z. Data from a run typically appears about 7 h 34 min after run time.

GRIB download times for the main models

Provider
ECMWF (Europe)
Region
Global
Resolution
~7.6 nm
Licence
CC-BY-4.0 (open data)

Schedule

Runs 00Z, 06Z, 12Z, 18Z. First data typically ~7h 34m after run time, complete after ~7h 34m.

Next run: 12Z, first data around .

Runs

The latest runs with when they actually arrived and whether that was on time, then the upcoming runs with the countdown to the first data. Times are in your timezone.

Get an alert when it is actually published

What wave models are for

Wave models take the forecast wind and work out the sea it builds: wave height, period and direction, often with wind sea and swell apart. They are only as good as the wind that drives them. Near the coast, shallow water and currents change the waves, so a coastal wave model beats a global one there.

ECMWF WAM has a grid spacing of about 7.6 nm, so each value stands for a box about that size. A model needs several grid boxes to show a feature, so details smaller than about 38 nm are smoothed out or missed.

Other global models

Comparing global models shows how certain the forecast is: when they agree, trust it more.

Punctuality

How reliably this model's runs are published. All models →

On time

100%

Typical delay

on time

Bad day

on time

Typical timing per run

How long after a run starts its data usually appears, for each run time. Use it to know when to check.

RunFirst data, typicalComplete, typicalComplete, slowest 10%
00Z+7h 34m+7h 34m+7h 34m
06Z+6h 27m+6h 27m+6h 27m
12Z+7h 34m+7h 34m+7h 34m
18Z+6h 27m+6h 27m+6h 27m

Times after the run's start (the hour in the “Run” column, UTC).

Coverage

Read more

Links

Homepage: https://www.ecmwf.int/en/forecasts/documentation-and-support